Refugee and host-community learners study together, S1 to S4, on Uganda's national curriculum.

From two learners to 277

The school opened in a church in 2020 with no external funding. After COVID-19 and a 2022 storm left two learners, SXLA rebuilt and JEP began that year. Today the school has 277 learners (Term One 2026), up from 102 in 2025.

Learners in school uniform sit at wooden desks during a lesson, some reading, some listening.
A lesson at Spectrum Secondary School. Photo: SXLA
Term One 2026

Our learners

  • 277learnersTerm One 2026 (up from 102 in 2025)
  • 154boarders, and 123 day learnersTerm One 2026
  • 65%refugee learners (181)Term One 2026
  • 41%girls (113)Term One 2026
  • 40JEP ScholarsTerm One 2026
People

The school team

13 teachers teach the national curriculum and guide JEP projects, with a non-teaching team of bursar, secretary, cooks, cleaners and security staff.

Headteacher Kyasimiire Christine leads the school, with Achiro Stella, Director of Studies, and Turyakyira Silver, Operations Manager, who also serve on SXLA's board.

Our people

Teachers sit in a circle of plastic chairs under a tree, discussing printed papers outside a school building.
Teachers in discussion at the school. Photo: SXLA
Scholarships

Scholarships

Each SXLA school awards scholarships to 10% of its learners: half to refugees and half to host-community youth, 80% of them girls, all from disadvantaged families and showing leadership. No scholarship holder is identified publicly without their and their parent's consent.

The campus

Facilities

What is in use today, what is being built and what is planned. About US$175,000 has been invested in the school since 2020 (as reported by SXLA, not audited). Of this, about US$12,800 (about 7%) went into JEP, including 10 laptops and connectivity since 2022.

In use

In use today

  • Classrooms
  • Girls' accommodation
  • Water
  • Kitchen
  • Security
  • The school laboratory
  • Library
  • JEP equipment: 10 laptops (5 working) and one portable Wi-Fi unit
Being built

Boys' dormitory

Construction began after funds arrived in August 2026. US$40,800 is still needed to finish the dormitory, a boys' latrine and beds for boys and girls.

Help finish the dormitory
Specification

Hybrid Edge JEP Studio and Spectrum Complete

The Hybrid Edge JEP Studio is specified so that learning continues when the internet does not. Further upgrades are planned through Spectrum Complete.

View Technical Specifications
The school kitchen, a small building with a blue roof and blue doors, with a cook preparing food at a table outside and water containers nearby.
In use: the school kitchen. Photo: SXLA
A large black rainwater tank beside a classroom block, fed by a pipe from the roof.
In use: a rainwater tank beside a classroom block. Photo: SXLA
Planned, 2027 to 2028

Spectrum Complete

Spectrum Complete is the campaign to finish the school: the Standard Hybrid Edge JEP Studio (about US$60,000), which follows only after the 2027 review at Spectrum and eight readiness gates, and campus upgrades (about US$140,000), including a boys' dormitory, classroom capacity, library, laboratory, sports field and civil works. Target: US$200,000 for 2027 to 2028 (planning estimate).

The boys' dormitory, already under construction, is the first of these upgrades.

Ways to support the school

You can help finish the boys' dormitory, equip the Hybrid Edge JEP Studio or support Spectrum Complete. The Support Our Work page explains the ways to give and what each gift supports.

Keep exploring

Explore more

JEP Studio

Why SXLA created JEP, and how learners move from a real challenge to knowledge, action and feedback.

Find out more

Our people

Our six board directors, JEP mentors, school leaders and the school team.

Find out more

Learner stories

A mission patch award and an S4 liquid soap team.

Find out more